#5 Bessemer and Lake Erie no. 154 (a 2-8-0 Consolidation) was built by the Baldwin Locomotive Works in 1909 and is now displayed in the museum’s railroad exhibit

Home »
#5 Bessemer and Lake Erie no. 154 (a 2-8-0 Consolidation) was built by the Baldwin Locomotive Works in 1909 and is now displayed in the museum’s railroad exhibit

Inside the Henry Ford Museum: A Photographic Journey Through American Innovation

#5 Bessemer and Lake Erie no. 154 (a 2-8-0 Consolidation) was built by the Baldwin Locomotive Works in 1909 and is now displayed in the museum’s railroad exhibit

Places & People